Place: | Diyarbakır |
Commencement: | 2011 |
Activity Status: | Under Construction |
Within the scope of the irrigation project undertaken by the Türkerler İnşaat A.Ş., a dam project at the height of 45 meter with the dam body consisting of 1.006.000 m³ core clay embankment and 2.900.000 m³ sand & pebble embankment is being constructed.