EMAAR LİBADİYE

Place: İstanbul
Commencement- Completion Date: 2011 - 2014

Within the scope of the project,  52 meter deep foundation excavation and shoring has been completed. An anchorage work with 243.057 meter has been carried out in the project, in which 2.777.997 m³ area has been excavated, and 53.028 meter bored piles have been penetrated.