KAYABEYİ DAM AND AKINCI HYDROELECTRIC POWER PLANT

Province: Ardahan
District: Çıldır
Project Power: 87 MW
Annual Power Generation: 305.000.000 kWh
Activity Status: In Operation
Explanation: Includes 2 horizontal axis Francis and 2 vertical axis Francis turbines at (2x38,091 MW + 2x5,261 MW) Powers