Place: | Aydın |
Commencement: | 2014 |
Activity Status: | Under Construction |
Facility, which is built on approximately 62 acres and will serve to Kuşadası, Davutlar and Güzelçamlı with a total population of approximately 333.000 people, the first stage average flow rate is 80.000 m³/day and the final flow rate of the second stage is 120.000 m³/day.